30 Years Of Covering Mumbai
Home > City news > Navi Mumbai gets Metro rail

Navi Mumbai gets Metro rail

Friday, May 21, 2010
By A Staff Reporter

Navi Mumbai is set to receive its first Metro rail with the City and Industrial Development Corporation of Maharashtra (CIDCO) proposing the first 21 km route as the Belapur-Kharghar-Taloje-Kalamboli-Khasndeshwar corridor. CIDCO has approached the state to authorize it as the implementing agency. About 124 gram panchayats of Panvel and Uran taluka have been informed about the project undertaken by CIDCO, which has already starting receiving both suggestions and criticism.

The project equally is divided into three phases. The proposed route from Belapur-Kharghar-Taloje-MIDC-Kalamboli- Khandeshar railway station will be extended up to the proposed Navi Mumbai International Airport. In the first phase, construction shall be from Belapur to Taloje. The total length of this line will be approximately 10.79 km and will have around 10 railway stations; Belapur Railway station, Sector-7 Belapur, Science Park, Utsav Chowk, Sector-14, Central Park, Pethapada, Sector-34, Panchnand and Pendhar.

In Phase-II the route will be from Khandeshwar to Taloje MIDC. The total length of the line will be around 8.15 km and have as many as seven railway stations; Khandeshwar Rly. Station, Sector-10 Kamothe, Sector-2E Kalamboli, Sector-7E Kalamboli, Sector-10E Kalamboli, Kasadi and two railway stations in MIDC area. Under Phase-III, two corridors shall be joined together between Pendhar and MIDC by a link of 2.2 km. This link shall form a loop from Belapur to Khandeshwar.

With the change in land use and considering the importance of commuting and transportation, it was found necessary to review the transportation system of Navi Mumbai. Accordingly, a new kind of transportation system like Metro railway is expected to be the ideal option. The work of preparation of master plan of the Metro rail Project was entrusted to Delhi Metro Rail Corporation (DMRC).

The six proposed rail corridors: 

  • Uran-Ranjanpada-Nerul (28.3 km)
  • Belapur-Kharghar-Taloje-Kalamboli-Khandeshwar-New Airport (21 km)
  •  Vashi-Nerul-Panvel (25 km)
  • Ranjanpada-Kharkopar-Seawoods (14 km)
  • Dighe-Turbhe-Belapur (20 km)
  • Vashi-Ghansoli-Mhape (9 km)
     

 


 

Facebook
COMMENTS
No Comments Posted
POST YOUR COMMENTS
Name:  
Email:    
Comments:
 
Diary
The Dr. B.R. Ambedkar Road stretching from Lalbau
Researchers have developed a miniature gas sensor
A first of its kind device that transforms ...
Everytime we have intercourse all the semen leaks
Dr. Rajan B. Bhonsle, M.D. (Bom)
Consulting Sex Therapist & Counsellor
Dr. (Mrs.) Minnu R. Bhonsle, Ph.D.
Consulting Psychotherapist & Counsellor
Astrology
Select Sun sign:
 
Aries (Mar 21 - Apr 20)
Aries (Mar 21 - Apr 20)Some good is likely to turn up out of the blue. You can seek the advice of an expert to arrive at decisions, but do not delay the signing of an agreement. You might not be given a second chance to re-consider. Try to close this project as soon as possible for only then you can make profit. Your romantic aspirations could be crushed. Family or friends may not approve of your choice of partner.
Tarot for Love
Select Sun sign:
 
Aries (Mar 21 - Apr 20)
Aries (Mar 21 - Apr 20)What the cards say: Confusion Path: Be alert. Don’t be impulsive Ally: Virgo will be objective. Avoid the advice of Cancer who will justify anything Card for the week: Tarot key no. IX Justice. You will reap as you have sown. If you have been just you will reap benefits. In the same way if you have wronged then nemesis is on its way
- Advertising -
From its fundamental role of providing basic prot
A “Strong balance-sheet, robust cash flows, geari
Indicating an imminent rate cut, RBI Governor Rag
Read More